Home
EXPERIENCE
RESIDENTIAL Projects
COMMERCIAL Projects
PROCESS
RESUME'
REFERENCES


EDUCATION

 

Oklahoma State School of Architecture Fully accredited, five year Bachelor of Architecture Degree – 1995

University of Illinois School of ArchitectureEuropean Summer Program - Versailles,  France - 1993

 

Experience 

1996-1998 BOORA Architects

NikeTown:  Miami, Las Vegas, and New York

                -Design Assist on Interior and Exterior Architectural ElementsUniversity of Seattle Student Center

                        -Design developmentNikeTown Sydney

                        -Schematic design, sketches, models, ad CAD drawings;Portland Public Schools Existing Buildings Review

                        -Research, investigation and drafting for 5 Southeast Schools

-Photographic documentation of existing conditions and reference for replacements;

 

1998-2000 Zimmer Gunsal Frasca

LDS Conference Center

Salt Lake City, Utah ; 21,000 seat auditorium

                -Designed, coordinated, and documented sixty-five stair assemblies

                -Collaborated on thirty member team to coordinate all systems and

                assemblies related to stair enclosures.National Institute of Health – Mark O. Hatfield Clinical Research Center

NIH Bethesda, Maryland ; Medical Laboratory and Health Care Facility

                -Collaborated and coordinated with a twenty five member team in Portland and a             ten member team in Washington, D.C.

                -Design development and construction documents on two pedestrian bridges      

                linking the wings of the building

                -Design development and construction documents on a seven story double helix

                stair within main atrium
              

2000-2005 William Church FAIA Architect, P.C. (2 man project teams)

Danmoore – 13 Story Transitional Housing

 8th NW 8th Portland, OR –Central City Concern

 

Design / Client Intent- wanted uplifting building that encourages interaction among tenants and reentry into society;

 

-Project Draftsman, Project Designer, Project Architect, Project Manager, zoning review,   code analysis, PDX type III design review;             

                -Schematic design thru 50% percent construction documents

                - Detail form and exterior for rain screen principles;

 Biltmore Hotel Affordable Housing

NW 6th and Everett Portland, OR – Central City Concern

Interior and exterior rehabilitation of the 100 year old, 3 story, URM building.

                -Seismic, Fire/Life Safety, Accessibility, and quality of living upgrades

                -Project Draftsman, Project Designer, Project Architect, (William Church, FAIA

architect of record), Project Manager

-Pre Development/Schematic Design thru Construction Administration

- Appeals and review and reconsiderations for design administration;


Hinds House- John Storrs Residential Design

Tigard, OR  97223

§  Tom and Judy Hinds recognized the potential of expanding on a fairly limited Storrs design but within his framework and nw natural wood finishes and trim we were able to propose a solution that complemented his original home.

§  2-story home with daylight basement set in a wooded setting on a neighborhood small man-made pond.

§  Space planning furniture (built- in casework and custom kitchen cabinet studies, kitchen upgrade, bathroom renovation, AV home theater room, basement, fireplance renovation to relate to Storrs’s woodsie northwest style

 Cedarwood School – Waldorf Elementary

        3030 SW 2nd Avenue -Portland, OR

Phased Rehabilitation and renovation of historic 100 year old, 3 story, URM building

                -Seismic, fire/life safety, and accessibility upgrades

-Project Draftsman, Project Designer, Project Architect, and Project Manager(William Church, FAIA architect of record)

-Schematic design thru construction administration

World Forestry Center

4033 SW Canyon Road- Portland, OR

Historic Logging Train Display Pavilion

                -relocate logging train

                -Schematic design thru construction administration

Carousel Pavilion Addition, code analysis, accessibility appeals, code appeals;

               -Schematic design thru permitting

 Bandon Dunes Golf Resort

        Bandon, OR

        Chrome Lake Cottages

                (21)2-story 2,3,&4 bedroom lodging building set in an established forest next to Chrome Lake.

 Bandon Trails Clubhouse

Entry Gatehouse/Pull cart storage and outdoor dining pavilion

Custom detailing and coordination

 Umpqua Discovery Center

        Reedsport, OR

Addition/ renovation of existing exhibit wing to accommodate local artists display on the local history, heritage, and environment. Exhibit space relies on wandering ADA compliant ramp to access all displays and the 2-story addition which serves as a look-out onto the lower Umpqua River.

-Project Draftsman, Project Designer and Project Architect(William Church, FAIA architect of record)

                        -Schematic design thru construction documents

Top